摩罗MORO蓄电池BS12-24/12V24AH现货直销价格
A. MORObattery capacity conversion curve
B. for 5 seconds and 1 minute discharge characteristic curve
C. Float charging pressure and temperature curve
D. Floating batterMOROy life and temperature curve
E. Different ratio for battery discharge impulse discharge current curve after 1 hour
F. Different ratio for battery discharge impulse discharge current curve after 0.5 hours
G. Battery capacity and discharge time curve
H. Different battery discharge rate, voltage and time relation curve
For all provide engineering special seal shall be affixed to the drawings, and for the final drawings.
7.1 the basic requirements
7.1.1 during this part for the implementation of the contract party to the quotation of the equipment supplied by inspection and performance test experiment was carried out, ensure the equipment to be provided by quotation in compliance with the requirements of the technical specification. Equipment and its main components are conducted in accordance with relevant state standard type test, factory test, all kinds of test are conducted according to relevant standards and regulations of the state. Each group, all battery factory experiment was carried out, and to provide a complete test report and factory test reports and test acceptance criteria.
7.1.2 MORO batteryoffer party shall within one month after the contract comes into force, to make an inquiry in connection with this contract equipment to be supplied by inspection, performance acceptance test criteria, and in the test report will be a month ago test standards, plans and reports to send inquiry party inspection. Relevant standards shall comply with the provisions of the technical specification.
7.1.3 offer will match all equipment field test of the machine.
7.1.4 inquiry think a test condition, content, procedure, sure and record any item is not in conformity with the relevant requirements, shall have the right to refuse to accept the test report to redo the test.